Brace for heavier traffic along C5 due to bridge repairs

Aika Rey

This is AI generated summarization, which may have errors. For context, always refer to the full article.

Brace for heavier traffic along C5 due to bridge repairs
Repair works for the CP Garcia bridge along C5 Road will happen for a year, starting Wednesday, February 6

MANILA, Philippines – Brace for heavier traffic as the Department of Public Works and Highways (DPWH) conducts repair works of a flyover and a bridge along C5 Road.

In an advisory on Thursday, January 31, the Pasig City Command Center (C3) said contractor Mac Builders will be retrofitting the C5 flyover and CP Garcia Bridge in Pasig for a year, starting Wednesday, February 6.

The repair work would effectively affect nearby cities Makati and Taguig.

The Pasig C3 asked motorists to take an alternate route.

In a separate statement, DPWH said it will be conducting road reblocking and repair works starting Friday, February 1, at 11 pm until February 4, at the following portions of C5 Southbound:

  • After Lanuza Avenue before Bagong Ilog flyover
  • Across SM Aura

In July 2018, DPWH National Capital Region said 36 bridges in 10 cities in the metro needs to be strengthened in the event of a strong earthquake. When the West Valley Fault moves, a magnitude 7.2 earthquake could hit Metro Manila. (LOOK: High resolution West Valley Fault maps launched)

CP Garcia bridge is among the bridges that received allocation from the P726.78-million DPWH budget in 2018 for bridge retrofitting. – Rappler.com

Add a comment

Sort by

There are no comments yet. Add your comment to start the conversation.

Summarize this article with AI

How does this make you feel?

Loading
Download the Rappler App!
Sleeve, Clothing, Apparel

author

Aika Rey

Aika Rey is a business reporter for Rappler. She covered the Senate of the Philippines before fully diving into numbers and companies. Got tips? Find her on Twitter at @reyaika or shoot her an email at aika.rey@rappler.com.